Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors. Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies. Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope. Ash Removal It should be auto ash removal system. Fuel It should be dual system, such as diesel and natural gas. Feeding System Should be auto feeding system into primary chamber. Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc. Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C. Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C. Flue treatment and cleaning Read More
Supply of Inclinators for Interim Arrival Domestic Terminal Project
CMC Services for Inclinators for 3 years including all spares, consumables, Skilled Manpower, tools and tackles all complete. As per Scope attached as Annexure Design, Manufacture, Supply, delivery to site, installation, testing & commission of All weather proof Passenger Inclinators in accordance to the Scope and outline specifications mentioned in AnnexureSpesifikasi Incinerator 100kg/jam Spesifikasi dan Daftar Material Dimensi dan Power Capacity Nama Barang : INCINERATOR Type / Model : PWR-INC-KMN 10 Kapasitas : 100kg/Jam (1 m3) Length : 288 cm Width : 147 cm Height : 163 cm Height of Chimney std : 700 cm TOTAL WEIGHT : 8000 kg Panel – timer : Digital Included Auto Alarm Finishing : Hot endured paint Fuel tank : 200 Liter Covering Element from steel : 3-8mm Banyaknya Burner : 2 pcs Banyaknya Blower : 2 pcs Max. Fuel consumption : 15-30 Liter/Jam Max. Elektric consumption : 1100 Watt Bahan bakar : Kerosene / Diesel (solar) Voltage : 220 V / 1 phase / 50 Hz Material 1. PANEL CONTROL Type : Digital Buatan : Local KAMINE ( Panel dan Incinerator satu Merek) Voltage : 220 V / 1 phase / 50 Hz Safety operator : Emergency Stop System : Microkontroller Pengoperasian : Semi Automatic Temperatur control : Digital Coupler Type Control panel : Manual dan automatic Tipe : Self Standing Type / Wall Mounted Type Material : Mild steel Thermocontrol : 2 (Dua) 1200 ºC Set of timer : 0- 2 jam Read More
Первичная камера: прочный корпус из мягкой стали, высококачественная огнеупорная футеровка и изоляция 01
Первичная камера: Сверхпрочный корпус из мягкой стали, высококачественная огнеупорная футеровка и изоляция 01 x газовые горелки (автоматические) 01 x точек датчика температуры с внутренними вентиляторами в сборе. Вторичная камера: Прочный корпус из мягкой стали, высококачественная огнеупорная футеровка и изоляция. 01 горелки для природного газа (автоматические) с внутренними вентиляторами 01 в сборе. 02 сек. Время пребывания Read More
Supply of Inclinators for Interim Arrival Domestic Terminal Project
CMC Services for Inclinators for 3 years including all spares, consumables, Skilled Manpower, tools and tackles all complete. As per Scope attached as Annexure Design, Manufacture, Supply, delivery to site, installation, testing & commission of All weather proof Passenger Inclinators in accordance to the Scope and outline specifications mentioned in AnnexureSpesifikasi Incinerator 100kg/jam Spesifikasi dan Daftar Material Dimensi dan Power Capacity Nama Barang : INCINERATOR Type / Model : PWR-INC-KMN 10 Kapasitas : 100kg/Jam (1 m3) Length : 288 cm Width : 147 cm Height : 163 cm Height of Chimney std : 700 cm TOTAL WEIGHT : 8000 kg Panel – timer : Digital Included Auto Alarm Finishing : Hot endured paint Fuel tank : 200 Liter Covering Element from steel : 3-8mm Banyaknya Burner : 2 pcs Banyaknya Blower : 2 pcs Max. Fuel consumption : 15-30 Liter/Jam Max. Elektric consumption : 1100 Watt Bahan bakar : Kerosene / Diesel (solar) Voltage : 220 V / 1 phase / 50 Hz Material 1. PANEL CONTROL Type : Digital Buatan : Local KAMINE ( Panel dan Incinerator satu Merek) Voltage : 220 V / 1 phase / 50 Hz Safety operator : Emergency Stop System : Microkontroller Pengoperasian : Semi Automatic Temperatur control : Digital Coupler Type Control panel : Manual dan automatic Tipe : Self Standing Type / Wall Mounted Type Material : Mild steel Thermocontrol : 2 (Dua) 1200 ºC Set of timer : 0- 2 jam Read More
Твердые отходы Тиниан: куда идти?
Предлагаются ТРИ варианта утилизации твердых отходов Тиниана: сжигание, метод Фукуока или утилизация за пределами острова. Тихоокеанские морские силы недавно провели встречу специального комитета с Бюро по охране окружающей среды и качества прибрежных районов, Агентством по охране окружающей среды, мэрией Тиниан, Департаментом общественных работ и представителями администрации в офисе BECQ на Мидл-роуд, чтобы наметить направления, по Read More
incinerador 500 kg por hora
La cámara de combustión secundaria debe destruir el producto contaminante y debe resistir a altas temperaturas (1100 ° C) Sistema de filtrado de procesos: Scruber debe mencionarse como opcional Cumplimiento de estándares de emisión: BS 3316 o estándar equivalente Versión, toda la carcasa de los animales (ganado, caballos, Ovinos, porcinos, etc.), así como residuos biológicamente Read More
Incinérateur de déchets médicaux: services essentiels d'élimination des déchets médicaux fournis par Meda Send
Entreprises d’élimination des déchets médicaux Suggestions de services de déchets médicaux Il existe différents types de déchets dont les gens doivent être conscients afin d’éviter l’exposition à ces déchets qui peuvent causer des maladies et des maladies. Les déchets dangereux sont l’un des types de déchets les plus dangereux dont les gens doivent se débarrasser. Read More
INCINERATOR SPECIFICATION Capacity UPTO 20 kg/hr
Size: 940 x860x2700 mm Material: STAINLESS STEEL STACK, REFRACTORY CONCRETE LINING SPECIAL INSULATION MATERIAL With burner: 15 C 20 KW Temperature: PRIMARY CHAMBER = 800°C AND SECONDARY CHAMBER = 850 – 1200° C Sufficient heat generation for secure and complete combustion 600-800 °C in the first chamber and >1000 °C in the second chamber Easy transportation on standard EURO-pallets Constructed in a modular fashion easy on-site movement and assembly with a minimum of equipment and technical skills; For the destruction of problematic waste like sharps, amputates and body parts, wet or moist matter; Off-gas quality: moderate smoke emissions during one quarter of the total incineration time; no visible emission during three quarters. AS PER INTERNATIONAL STANDARDS The remaining ash approximately 5-10% in weight and below 1% in volume of the original waste AS PER INTERNATIONAL STANDARDS Chimney height at least 5 m above the incinerator 5m ABOVE FROM THE GROUND Temperature resistance of the lining at least 1,200 °C
"Ugello per bruciatore a combustibile"
Ugello per bruciatore a combustibile
Hersteller von Verbrennungsanlagen in China
1. Beträgt die Verweilzeit mehr als 2 Sekunden? 2. Ist die Primär- und Sekundärluft vorgewärmt? 3. Könnte es als kontinuierliches System bereitgestellt werden? 4. Gibt es ein Überwachungssystem für Betriebsparameter? (Temperatur) 5. Gibt es ein Datenerfassungssystem? 6. Bietet es Kontrollmaßnahmen zur Anpassung der Abfallzufuhr, der Rostgeschwindigkeit sowie der Temperatur, des Volumens und der Verteilung von Read More