N.D. could get Ebola waste from Calif..

FARGO, N.D. — California health officials have given note that North Dakota is among six countries that may get Ebola medical waste in case the state has any material to incinerate. In a note published last week, the California Department of Public Health listed North Dakota as one of six states where California pushes medical Read More

Smaller cremators incinerators

Smaller cremators that will run diesel and will be capable of doing all the other dogs/cats/pets that we have. We only cremate pets individually so this is what we require. Have your company as member of Markis Hospital waste management group as planer or supplier, contractor of solutions or operating partners of the solution of hospital waste management in the projects we are developing, starting with Larissa and Volos. Members of Markis waste management group will also have the possibility to provide training and technical services to the health sector of Greece and other countries via the TSC which we plan to make the same time in Larissa (enclosed diagram indicates the role of each party joining Markis waste management group). ● Able to burn 25-30kg per hour ● Consist of two chambers to ensure significant reduction in emission ● Be capable of temperature in range of 800c to 1000c ● Low maintenance design ● Must be Diesel fuelled ● Need more than 15amp 220- 250V power ● kW Consumption power consumption to be stated ● Onboard or in-built fuel storage storage tank & should use no more than 12L of dies el per hour to burn 25-30kg of waste ● Solid waste reduction in range of 90-97% ( should be routinely achieved) 1. –  2 medical waste autoclaves 350ltr and 100ltr 2. – 1 medical waste shredder 3. –  3 medical macerators 4. – 27 Waste transfer trolleys.

Hersteller von Verbrennungsanlagen

WAREN: EINE VERBRENNUNGSMITTEL NACH DEM LIEFERANT’ ANFORDERUNG S. BESITZEN Vorgeschlagen SPEZIFIKA TION / BESTÄTIGEN ATION TECHNISCHE DATEN Höhe von der Basis: 11 m und wenn es Gebäude innerhalb von 30 m von der gibt Verbrennungsanlage, Schornstein muss mindestens 3 m über die Scheitelpunkte aller ragen die Dächer solcher Gebäude Durchmesser des Schornsteins oben: 430 mm Read More

One chamber incinerator

One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?

Kenya: Comment les déchets médicaux toxiques et infectieux nuisent aux citoyens

Une visite à l’hôpital ne révèle généralement pas ce qui se passe à l’arrière. C’est ici que le sang et les tissus corporels jetés et les pièces provenant des chirurgies, des produits pharmaceutiques, des flacons de médicaments – des tonnes de déchets hospitaliers – passent. Dans le cas de l’hôpital national de Kenyatta, cela pourrait Read More

incineradores de china

Se debe realizar una prueba de funcionamiento para garantizar que todos los componentes de control se hayan instalado y que todas las partes del incinerador, incluidos los controles y los dispositivos de seguridad, se encuentran en condiciones de funcionamiento satisfactorias. La Deben verificarse los requisitos para la purga previa y el tiempo entre reinicios. La Read More

One chamber incinerator

One (MAIN) chamber only, with two doors Doors with hinges at the center LPG combustible mainly After burner and chimney don′t change MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete Burning Rate:47.5–50kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash post 100kg:Max 3.8kg 1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time 2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day?? 3)      How many hertz do we need for this type of incinerator 4)      Where is the oil tank in the incinerator? 5)      Is it possible to build in not the standard accessories but the high proof accessories? 6)      What are the costs when shipment is to Surinam/South America 7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly?  And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company. So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.   Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country. So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?

Инсинератор мощностью разрушения по весу: 60 кг / час.

Мощность разрушения по весу: 60 кг / час. Он должен работать не менее 10 часов в день. Этот мусоросжигательный завод должен уметь уничтожать все горючие отходы, производимые больницами, частными клиниками, лабораториями, институтами и т. Д. Технические условия на проектирование: типы медицинских отходов A, B, C, D и E   «ПИРОЛИТИЧЕСКОЕ» сжигание, контролируя газификацию отходов. Инсинератор Read More

islands incinerators

Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature – over 12000C Two chambers – minimum Emissions – dioxin and heavy metaly – better then Kyoto protocol Emission – monitoring system Waste unloiding – directly from waste track to incinerator Burn Rate(Average kgs/hr)  25 kg   primary chamber  800 degree   secondary chamber  1000 degree   chimney  standard   shredder  separately   Autoclave or microwaves  separately   temperature monitor  attached outside of machine operating  Fuel and electric   –          Toxic and dangerous wastes,   –          Medical pharmaceutical and hospitable liquids  Wastes –          Domestic garbage   –          Electric and electronic wastes –          Industrial wastes –          In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before 4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai 5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system.  please send me the price and catalog for this item 6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog 7) 2 units 1.5 tonne Fork Lift  ( if you know good price and quality  company in china) 8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers. 9) Spare Parts For 2 Years Operation & Maintenance  for YD-300 and for the above machines 10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted The highest temperature that the filter bag can operate continuously is 260C.    In order to add a bag house using our filter products,  you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C.    If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.